In the McIntire, Derby Street, Lafayette Street and Washington Square districts, exterior changes visible from a public way need a Certificate of Appropriateness from the Salem Historical Commission before work starts. Applications go through the city's online permit system, due 16 days before a meeting.
[1][2][3]The guidelines steer modern additions like decks to the less important sides of a house. A porch addition needs full elevation drawings showing railings, balusters, materials and paint color, and period porches shouldn't be left unpainted.
[1]Salem's Inspectional Services takes building, plumbing and gas permit applications through an online system, with card or check payment built in. You need an email address to use it.
[1]