In the McIntire, Derby Street, Lafayette Street and Washington Square districts, exterior changes visible from a public way need a Certificate of Appropriateness from the Salem Historical Commission before work starts. Applications go through the city's online permit system, due 16 days before a meeting.
[1][2][3]Inside the districts, the Commission reviews paint colors, including windows, doors, porches and the colors of storm doors and windows. Include a paint chip. Repainting in the same colors is ordinary maintenance and gets a Certificate of Non-Applicability instead.
[1]The guidelines steer modern additions like decks to the less important sides of a house. A porch addition needs full elevation drawings showing railings, balusters, materials and paint color, and period porches shouldn't be left unpainted.
[1]Salem's updated Wetlands Protection and Conservation Ordinance took effect March 28, 2022. It sets a 25-foot no-disturbance zone and a 50-foot mitigation zone measured from a resource area, and it covers isolated wetlands and vernal pools.
[1]Salem's Inspectional Services takes building, plumbing and gas permit applications through an online system, with card or check payment built in. You need an email address to use it.
[1]