Boston's Inspectional Services Department issues a Short-Form permit for minor work that doesn't change a building's structure or use, like opening up a wall, and a Long-Form permit for work that does. Both are filed through the ISD online portal, and starting before the permit is issued can mean double the permit cost or a code violation.
[1][2]Repairing a roof deck with no structural change takes a Short-Form permit plus the original permit and engineer-stamped plans. A brand new roof deck, a bigger one, or a repair without the original plans takes a Long-Form permit.
[1]Inside Boston's historic districts, exterior work needs commission approval before it starts. Back Bay reviews all proposed exterior work, Beacon Hill reviews exterior work visible from a public way, and the South End reviews front facades, visible rooftops and walls facing a public way. The commissions say not to buy materials until you're approved.
[1][2][3][4]A dumpster or work area on a Boston street or sidewalk needs a Street Occupancy Permit from Public Works, applied for at least seven business days ahead. In residential areas, signs go up at least three days before the job.
[1][2]