DT Painting & Services

Painting and remodeling contractor for Boston, MA.

From Charlestown row houses to East Boston three-deckers, Boston work runs through ISD permits, district commissions and a 7-to-6 weekday clock. We plan for all three.

About 5 mi from our home base in Malden.
Service area around Malden, MAMalden (home base)EverettMedfordSomervilleMelroseStonehamWakefieldSaugusRevereLynnPeabodySalemBostonLynnfieldReading

Estimate request: Boston

Free · no obligation · we call back within 1 business day

A city built on filled land and old houses.

Boston isn't one kind of house. Beacon Hill has Federal and Greek Revival homes from architects like Asher Benjamin and Alexander Parris. The South End is long uniform rows of rowhouses, started in 1850 on filled marsh. Back Bay went up block by block as tidal flats were filled in.

Then there are the three-deckers. A 1999 city housing report found East Boston had the highest share of them among its one- to three-family buildings, with Roxbury and Dorchester close behind. Each of those buildings is three households, three kitchens, three sets of back stairs.

We drive in from Malden, so Charlestown and East Boston are the shortest trips. But the rules below apply in every neighborhood, and we read them before we quote, not after.

What changes from one neighborhood to the next.

Charlestown

The Landmarks Commission is studying a Monument Square Landmark District here. It isn't designated yet, but owners near the square should watch for it.

East Boston

Three-decker country, and one of the coastal neighborhoods the city has written flood resilience plans for, from Chelsea Creek to Wood Island Marsh.

Beacon Hill

Exterior work seen from a public way goes to the Beacon Hill Architectural Commission, including views from the Common, the Public Garden and Storrow Drive.

Back Bay

All proposed exterior work goes to the Back Bay Architectural District Commission before it starts. The district sits on filled tidal flats.

South End

Front facades, visible rooftops, and side or rear walls facing a public way all need South End Landmark District Commission approval.

Bay Village

Its own historic district since 1983, one of the ten district commissions working under the Landmarks Commission.

Dorchester and Roxbury

Heavy on three-deckers. Roxbury also has the Highland Park Architectural Conservation District, designated in 2022.

Boston rules we check before we quote.

Boston runs its own permit office, ten historic district commissions and its own work-hour ordinance. These are the ones that touch our trades.

ISD short-form vs. long-form permits

Boston's Inspectional Services Department issues a Short-Form permit for minor work that doesn't change a building's structure or use, like opening up a wall, and a Long-Form permit for work that does. Both are filed through the ISD online portal, and starting before the permit is issued can mean double the permit cost or a code violation.

[1][2]

Roof deck permits

Repairing a roof deck with no structural change takes a Short-Form permit plus the original permit and engineer-stamped plans. A brand new roof deck, a bigger one, or a repair without the original plans takes a Long-Form permit.

[1]

Historic district design review

Inside Boston's historic districts, exterior work needs commission approval before it starts. Back Bay reviews all proposed exterior work, Beacon Hill reviews exterior work visible from a public way, and the South End reviews front facades, visible rooftops and walls facing a public way. The commissions say not to buy materials until you're approved.

[1][2][3][4]

Construction hours: 7 a.m. to 6 p.m. weekdays

City ordinance 16-26.4 limits building alteration and repair to 7 a.m. to 6 p.m. on weekdays. Anything outside that needs an Off Hours Permit from ISD, granted per event.

[1][2]

Street occupancy permit for a dumpster on the street

A dumpster or work area on a Boston street or sidewalk needs a Street Occupancy Permit from Public Works, applied for at least seven business days ahead. In residential areas, signs go up at least three days before the job.

[1][2]
Statewide, in every town

One statewide building code. Massachusetts uses a single building code for every town: 780 CMR, now in its tenth edition. Your local building department enforces it and issues the permits. source

Dig Safe before digging. State law requires notice to Dig Safe at least 72 hours before digging, not counting weekends and legal holidays. That includes holes for deck footings. Call 811. source

Boston by the numbers that matter here.

Historic district commissions
10, plus the Landmarks Commissionsource
City sitting on landfill
About one-sixthsource
Coastline studied for flood plans
47 milessource
Regular construction hours
7 a.m. to 6 p.m., weekdayssource
Street occupancy lead time
At least 7 business dayssource
Site conditions

Water is the Boston question.

The city says the history of landmaking is part of why Boston is so exposed to sea level rise. Back Bay, the Seaport and parts of downtown are all filled ground. Charlestown, Dorchester, Downtown and the North End, East Boston and South Boston each have a coastal resilience plan.

Inside the house, the risk is often the sewer. Boston Water and Sewer says short, heavy storms can overload the system and push water back up into an unprotected basement. That's the first thing we look at before we finish one.

One call, one crew, one walkthrough.

Doug walks the job, tells you which Boston permits and reviews apply, and lays out where you can save. Free written estimate, and a call back within one business day.

Boston questions we hear on walkthroughs.

Usually, yes, and the question is which kind. ISD's Short-Form covers minor work that doesn't change structure or use; anything that moves structural walls or changes use is a Long-Form. We tell you which one at the walkthrough.

Other places we work near Boston.

Area not listed? Call 781-866-6546. We travel for the right job.

Where this information comes from.

Local rules change. We link the official pages so you can check the current version, and we confirm what your job needs when we come look.

  1. 1.Short-Form Permit, Inspectional Services, Boston.gov
  2. 2.Long-Form Permit, Inspectional Services, Boston.gov
  3. 3.Renovate a Bathroom or Kitchen, Boston Permitting
  4. 4.Install or Repair a Roof Deck, Boston Permitting
  5. 5.Boston Landmarks Commission (historic districts list)
  6. 6.South End Landmark District, Boston.gov
  7. 7.Historic Beacon Hill District, Boston.gov
  8. 8.Back Bay Architectural District, Boston.gov
  9. 9.Beacon Hill Architectural Commission approved minutes, March 20, 2025 (One month of minutes; shows paint colors reviewed in practice, not a written rule.)
  10. 10.Monument Square Landmark District Study (Charlestown), Boston.gov (District under study, not designated.)
  11. 11.Off Hours Permit Application (incl. ordinance 16-26.4), Inspectional Services
  12. 12.Noise in Boston, Boston Public Health Commission
  13. 13.How to Get a Street Occupancy, Excavation, or Driveway Permit, Public Works
  14. 14.Dumpster Regulations, City of Boston (Older document on the legacy cityofboston.gov site; used only alongside the current Public Works page.)
  15. 15.Stormwater Management for Small Businesses, Boston Water and Sewer Commission
  16. 16.Protect your home from sewer backups with a backwater valve, BWSC
  17. 17.Coastal Resilience Planning, Climate Ready Boston
  18. 18.Article 25A Coastal Flood Resilience Overlay District, Boston Planning
  19. 19.Triple Decker Trends, Department of Neighborhood Development (June 1999) (Dated (1999) data; cited only as a 1999 report.)
  20. MATenth edition of the MA State Building Code (780 CMR), Mass.gov
  21. MAM.G.L. c. 82, § 40A (excavation notice)

Need work done in Boston?

Send a request or give us a ring. We'll come out to Boston, look at the job and give you a written price. Free.

DT Painting & Services logo on a yard sign
Free estimates
781-866-6546