DT Painting & Services
Wood deck with white rail posts and balusters
Melrose, MA

Deck Building & Repair in Melrose, MA

Decks built and repaired in Melrose, MA, with the lumber, footing and concrete details the city wants on every deck application.

About 2 mi from our home base in Malden.

Deck Building & Repair estimate: Melrose

Free · no obligation · we call back within 1 business day

Decks built and repaired in Melrose, MA, with the lumber, footing and concrete details the city wants on every deck application.

The Melrose permitting guide asks deck applications for lumber dimensions, column and footing sizes, and the type of concrete. We put that on paper before you sign, so the city sees the same deck you approved.

Backing onto a pond or a wet edge of the Fells? Melrose's Chapter 231 reaches 100 feet from ponds of any size and intermittent streams, so the Conservation Commission may need to sign off before footings go in. Retaining walls need a city permit too.

Our deck building & repair work.

Wood deck with white rail posts and balusters
Recent deck.

Our work around Boston and the North Shore.

Local rules

Melrose rules that matter for deck building & repair.

We confirm what your job needs when we come look.

  • Permits go through SimpliCity

    Melrose takes building permit applications online through its SimpliCity portal; paper is accepted only in extreme cases. The fee is based on the real total cost of the job, and the city's Property Building Permit History lookup shows past permits on a house. [1][2]

  • Deck applications need structural details

    The city's permitting guide says a deck application must list lumber dimensions, column and footing sizes, and the type of concrete. Melrose zoning also requires permits for sheds, fences, driveways and retaining walls even where the building code doesn't. [1]

  • Chapter 231 wetlands ordinance

    Melrose's own wetlands ordinance (Chapter 231, 2007) protects ponds of any size, intermittent streams, vernal pools and floodplain, plus a 100-foot strip around most of them. Building, clearing, grading or landscaping there needs a permit from the Conservation Commission first. [1][2]

One statewide building code. Massachusetts uses a single building code for every town: 780 CMR, now in its tenth edition. Your local building department enforces it and issues the permits. source

Dig Safe before digging. State law requires notice to Dig Safe at least 72 hours before digging, not counting weekends and legal holidays. That includes holes for deck footings. Call 811. source

Deck Building & Repair questions from Melrose

Lumber sizes, column and footing sizes, and the concrete type, per the city's guide. A plot plan may be required depending on scope.

Deck Building & Repair in Melrose?

Send a request or give us a ring. We'll come to Melrose, look at the job and give you a written price. Free.

DT Painting & Services logo on a yard sign
Free estimates
781-866-6546