DT Painting & Services
White shaker kitchen with plank tile floor

Painters and remodelers for Melrose, MA homes.

Melrose is mostly older single-family houses ringed by the Fells and three ponds. We paint them, fix them up inside, and build the decks out back, one crew from Malden.

About 2 mi from our home base in Malden.

Estimate request: Melrose

Free · no obligation · we call back within 1 business day

Old houses, green edges.

Melrose is a city of houses. The city says almost 60% of its land is in residential use, and a greenbelt covering 26% of the city wraps around the edges: the Middlesex Fells, Mount Hood, and the land around Swains Pond, Ell Pond and Towners Pond.

Most of those houses went up before World War II, and about another quarter came between 1940 and 1969, per a 2020 MAPC housing study for the city. That means plaster walls, old trim, layers of paint, and basements that were never meant to be living space. That's the work we like.

The Victorian Fair each September is where the Historical Commission sets up its booth, and the commission runs a "Research Your Own Home Night" too. That tells you how much the city cares about its old houses, and we plan the job with the same care.

What Melrose City Hall will ask about.

These are the city's own rules that touch our trades. We check them before we price a job, so a permit question doesn't stall things in week two.

  • Permits go through SimpliCity

    Melrose takes building permit applications online through its SimpliCity portal; paper is accepted only in extreme cases. The fee is based on the real total cost of the job, and the city's Property Building Permit History lookup shows past permits on a house. [1][2]

  • Deck applications need structural details

    The city's permitting guide says a deck application must list lumber dimensions, column and footing sizes, and the type of concrete. Melrose zoning also requires permits for sheds, fences, driveways and retaining walls even where the building code doesn't. [1]

  • Painting and floor sanding are exempt

    Melrose lists ordinary repairs, painting, wallpapering, floor sanding, sandblasting and carpeting as work that doesn't need a building permit. Renovations, new material and changes to a means of egress do. [1]

  • Chapter 231 wetlands ordinance

    Melrose's own wetlands ordinance (Chapter 231, 2007) protects ponds of any size, intermittent streams, vernal pools and floodplain, plus a 100-foot strip around most of them. Building, clearing, grading or landscaping there needs a permit from the Conservation Commission first. [1][2]

  • Demolition review for pre-1900 buildings

    Under the city's Demolition Review Ordinance (Chapter 132), taking down 50% or more of a building's exterior surface, walls and roof counted together, goes to the Historical Commission if the building was built in 1899 or earlier or is on the National Register. A building found 'preferably preserved' can wait up to 12 months. [1][2]

Statewide, in every town

One statewide building code. Massachusetts uses a single building code for every town: 780 CMR, now in its tenth edition. Your local building department enforces it and issues the permits. source

Dig Safe before digging. State law requires notice to Dig Safe at least 72 hours before digging, not counting weekends and legal holidays. That includes holes for deck footings. Call 811. source

Melrose at a glance.

Land in residential use
Almost 60%source
Greenbelt share of the city
26%source
Ponds in the greenbelt
Swains, Ell and Townerssource
Permit portal
SimpliCity (online only)source
Wetlands ordinance
Chapter 231, adopted 2007source
Demolition review trigger
Built 1899 or earlier, or on the National Registersource
Site conditions

Ledge, slopes and pond edges.

The city's conservation page says some Melrose parcels were long thought unbuildable because of steep slopes, ledge, or wetlands. If your yard climbs toward the Fells or Mount Hood, expect us to talk about footings and drainage before we talk about deck boards.

Near the ponds the bigger issue is paperwork. Melrose's own wetlands ordinance covers ponds of any size and intermittent streams, plus a 100-foot strip around them. A wet corner of the yard can count.

Painting needs no permit here. A deck does.

Melrose lists painting, wallpapering and floor sanding as permit exceptions. Decks, foundations and most remodels go through the online portal. We'll tell you which side of that line your job falls on at the walkthrough.

Melrose questions we hear.

No. The city lists painting and wallpapering as permit exceptions. If we're also replacing rotted siding or trim, that repair may need one, and we'll file it on SimpliCity.

Next door to Melrose.

Area not listed? Call 781-866-6546. We travel for the right job.

Need work done in Melrose?

Send a request or give us a ring. We'll come out to Melrose, look at the job and give you a written price. Free.

DT Painting & Services logo on a yard sign
Free estimates
781-866-6546