DT Painting & Services
Side of a two-story colonial with freshly painted siding

House Painting and Remodeling in Everett, MA

Most Everett homes sit on the hills north of Route 16, and 63% were built before 1940. We work right next door, out of Malden.

About 1 mi from our home base in Malden.

Estimate request: Everett

Free · no obligation · we call back within 1 business day

Site conditions

Hills for houses, rivers for industry.

Everett covers about 3.5 square miles between the Mystic and Malden rivers. The city's 2021 draft hazard plan puts most homes in the upland hills north of Route 16. The low ground by the water holds rail yards, tank farms and produce warehouses.

A lot of that low ground is fill. The Island End River was filled in the early 1900s for industry and later culverted, and the plan links many of today's flood problems to it. The New England Produce Center area gets the worst coastal flooding.

Inland, the problem is pavement and old pipes. The plan names the Second Street corridor, Air Force Road, the Commercial Triangle and the blocks around Glendale Park as places where rain backs up.

Everett's housing, by the numbers.

Land area
About 3.5 square milessource
Homes built before 1940
63%source
Homes built since 1980
13%source
Units in 2-4 unit buildings
55.5%source
Single-family units
26.4%source
Renter-occupied units
61%source

Everett permits and ordinances that touch a home project.

Taken from the Everett code and city department pages. We confirm the current version before each job.

  • Permits for street space and dumpsters

    Using part of a public way while repairing a building takes a permit from Everett's city services commission and a bond. The space has to be barricaded and lit at night, with a safe path kept for walkers. Dumpster and POD permits are filed in person at the Engineering Department in City Hall and signed off by the fire and police chiefs. [1][2]

  • 50 dBA night limit, 6 p.m. to 7 a.m.

    Everett's disturbing-the-peace ordinance treats noise above 50 dBA, measured at the lot line, as unreasonable between 6 p.m. and 7 a.m. [1]

  • No paint or solvent in the storm drains

    Everett's stormwater ordinance bars any pollutant from the municipal storm drain system, or from pavement connected to it. The ordinance's definition of pollutant names paints, varnishes and solvents. [1][2]

  • Demolition review at 80 years

    Since 2025, a permit to raze 50% or more of a building that is 80 or more years old by assessor records, or on the State or National Register, goes to the Everett Historical Commission. The Commission holds a hearing within 35 days, and a building it votes to preserve faces a six-month moratorium. [1]

  • Conservation Commission near the rivers

    Everett's Conservation Commission reviews work in the buffer zones of the Mystic, Malden and Island End rivers under the state Wetlands Protection Act. Filing materials are due to the Conservation Agent two weeks before the monthly meeting. [1]

Statewide, in every town

One statewide building code. Massachusetts uses a single building code for every town: 780 CMR, now in its tenth edition. Your local building department enforces it and issues the permits. source

Dig Safe before digging. State law requires notice to Dig Safe at least 72 hours before digging, not counting weekends and legal holidays. That includes holes for deck footings. Call 811. source

Parts of Everett we pay attention to.

North of Route 16

The upland hills where most Everett homes are. Dense streets, older houses, lots of two-to-four-unit buildings.

Glendale Park area

Called out in the city's hazard plan for urban flooding. We check basements here closely.

Commercial Triangle

Between Route 16 and the commuter rail tracks. Another spot the plan flags for flooding in heavy rain.

Second Street corridor

The plan says it lacks stormwater infrastructure, so water has fewer places to go.

Island End River flats

Low, filled land near the Chelsea line with the city's worst coastal flooding.

Recent work from our crew.

Photos from DT jobs around Boston and the North Shore. We don't label them by town.

Large house with a stone front and gray siding
Exterior.
Finished kitchen with white cabinets and marble-look island
Finished kitchen. Marble-look counters.
Kitchen with skylight, island and pendant lights
Skylight kitchen.
Remodeled bathroom with glass shower doors and accent tile
Bathroom, done. New tub, tile and vanity.

Our work around Boston and the North Shore.

Everett homeowner questions.

Online, through the city's permitting portal run by Inspectional Services. You register once, then you can attach plans, track status and see inspection results. ISD is at City Hall, 484 Broadway, if you'd rather go in person.

Other cities close to Everett.

Area not listed? Call 781-866-6546. We travel for the right job.

Need work done in Everett?

Send a request or give us a ring. We'll come out to Everett, look at the job and give you a written price. Free.

DT Painting & Services logo on a yard sign
Free estimates
781-866-6546